Enterprise Case Study: Electrifying 500 Sites Across the UK

Time: 3:15 pm - 3:45 pm

Date: 2024-10-01

Theatre: Room Three

Synopsis

  • How is Enterprise planning to electrify 500 sites in the UK and convert a fleet of 360,000 vehicles.
  • The complexity of the rental use case – how Enterprise envision handling charging vehicles with irregular hours of driving, and 30-40 turnarounds a day.
  • How to solve the increased energy demands of each site – including battery boosted charge units, working with DNOs to solve connection challenges, and

Speaker

« Back